Shut at 10pm. Open at 6am.
The gents toilets at London Stansted were just eight months old when spills started soaking into the grout and staining the tiles beneath the urinals.
Stansted moved early. They asked our Specialist team to seal and protect the floor in a single overnight shift, with the toilets back in use by morning
Preparation first.
A coating is only as good as the surface beneath it.
We deep cleaned the floor with Recoat Etching Cleaner and a scrubber, then checked moisture levels after every stage. Nothing moved on until the meter read dry.
.
Primed and coated
We primed the floor with Recoat Stix Plus, laid on by T-bar at just three microns. Recoat Floor UV followed at 30 microns, rolled on with microfibre to seal tiles and grout alike. Between coats, fans kept the air moving to draw out the moisture.
Cured in seconds
A UV lamp takes the coating to 80% cure in five seconds, with full cure inside two hours. Two-pack floor coatings can take up to two weeks. That speed is what made one overnight shift possible.
The result
Sealed and protected.
Tiles and grout are now sealed, so spills sit on the surface instead of soaking in. The floor is slip resistant, quick to clean and free of odour.
Stansted protected a new floor before wear could set in, and their passengers have a cleaner, safer space for it.
Exclusive to Frost Group
Recoat is exclusively licensed to Frost Group for the UK transport sector, and our Specialist team applies it across floors, walls and fleets.